smsproject.hu

Cartoon .shop domain extension mascot: a pink .shop with two big eyes and a wide smile, waving with both hands

smsproject.hu is due to drop on 18 October 2026. Its archive history is still being checked.

Backorder it at Dynadot

Before the drop, a backorder is the usual way to try for a name; quieter names can often be registered just after it drops.

Everything we know about smsproject.hu

FreedDomains quality score, 0 to 100 (higher is better)13
Length of the name10
When the registry releases it18 Oct
Our fair-value estimate in pounds (a guide, not an appraisal)£2
Brandability, 0 to 100: short, pronounceable, no numbers or hyphens21
Passes the radio test: say it once and people spell it right
Registry statusPending delete
When we first listed it15 Oct
Whois birth year: when the name was first registered—
Archive birth year: first Wayback captureQueued
Years with Wayback captures—
Archive crawl months: months with Wayback captures—
Our 0 to 100 spam score—
Common Crawl rank, lower is stronger—
Wikipedia articles linking to it—
Majestic Million rank (referring subnets)—
Pages and language of the old website in Common Crawl—
What the old website was about, from the words in its archived page addresses—
Other extensions registered with the same name—
Registrar, from the registry—
Nameservers, from the registry—
Registry (EPP) statuses—
Dictionary words in the name—
Languages whose dictionary words make up the nameit nl
Word count—
Topic of the name—
Hyphens0
Numbers in the name0
Moz Domain Authority (when measured)—
Majestic Trust Flow (when measured)—
Ahrefs Domain Rating (when measured)—

Where this comes from

The drop date comes from the .hu registry parking list; history from the Internet Archive; authority and the old site's pages and language from Common Crawl; Wikipedia links from Wikipedia's public API; registrar and statuses from the registry's RDAP service. Scores are our own estimates: see how we score domains.

Check it yourself

Our domain history checklist walks through each step. More like this: names containing “smsproject”, the full list.